{"draft":"draft-ietf-rats-yang-tpm-charra-23","doc_id":"RFC9684","title":"A YANG Data Model for Challenge-Response-Based Remote Attestation (CHARRA) Procedures Using Trusted Platform Modules (TPMs)","authors":["H. Birkholz","M. Eckel","S. Bhandari","E. Voit","B. Sulzen","L. Xia","T. Laffey","G. C. Fedorkow"],"format":["HTML","TEXT","PDF","XML"],"page_count":"53","pub_status":"PROPOSED STANDARD","status":"PROPOSED STANDARD","source":"Remote ATtestation ProcedureS","abstract":"This document defines the YANG Remote Procedure Calls (RPCs) and\r\nconfiguration nodes that are required to retrieve attestation\r\nevidence about integrity measurements from a device, following the\r\noperational context defined in RFC 9683 \"TPM-based Network Device\r\nRemote Integrity Verification\". Complementary measurement logs\r\noriginating from one or more Roots of Trust for Measurement (RTMs)\r\nare also provided by the YANG RPCs. The defined module requires the\r\ninclusion of the following in the device components of the composite\r\ndevice on which the YANG server is running: at least one Trusted\r\nPlatform Module (TPM) of either version 1.2 or 2.0 as well as a\r\ncorresponding TPM Software Stack (TSS), or an equivalent hardware\r\nimplementation that includes the protected capabilities as provided\r\nby TPMs as well as a corresponding software stack.","pub_date":"December 2024","keywords":[],"obsoletes":[],"obsoleted_by":[],"updates":[],"updated_by":[],"see_also":[],"doi":"10.17487\/RFC9684","errata_url":null}